Speak to an AustralianBook a call ›
Book a call
  • Australian owned and operated
  • Project-specific compliance evidence coordinated
  • Typical factory production: 20–30 days
  • Typical delivery: 20–30 days
  • Typical 40–60 days total, factory to site
  • China factory pricing
  • Finance available through Ausloans
  • As seen in Domain
  • Written project scope before commitment
  • Models shown as starting points for project scoping
  • Australian owned and operated
  • Project-specific compliance evidence coordinated
  • Typical factory production: 20–30 days
  • Typical delivery: 20–30 days
  • Typical 40–60 days total, factory to site
  • China factory pricing
  • Finance available through Ausloans
  • As seen in Domain
  • Written project scope before commitment
  • Models shown as starting points for project scoping

Contact Us

Contact Info

}

Open Office Hours

M-F: 9am – 5pm

v

Get in Touch

futuremodularhomesau@gmail.com

Book a call

Email: futuremodularhomesau@gmail.com

We Can’t Wait to Make Your Ideas a Reality

Get In Touch


What are modular homes?

Modular Homes are prefabricated homes that are built in sections (modules) in a factory setting and then transported to the home site for assembly. Unlike traditional stick-built homes, the process is completed in a controlled environment, which can enhance quality control.

Are you modular homes expensive?

Modular homes often have lower construction costs due to the efficiency of factory production and reduced construction waste. This affordability can make homeownership more accessible for many individuals and families.

What do i put a modular home on?

Modular homes can be placed on different types of foundations, including string levelled ground, footings, concrete slab, or piers. This adaptability allows them to be situated in various locations according to local regulations and site conditions.

Where do you deliver?

We deliver our modular homes Australia wide. 

Future Modular Homes

Get a Quote

Australian owned and operated, with China factory pricing. Project-specific compliance evidence is coordinated for your certifier.

Typical factory production is 20–30 days and typical delivery is 20–30 days, around 40–60 days in total from order to site. Australia-wide logistics are coordinated by project; international enquiries are assessed individually.

Office hours Monday to Friday, 9am to 5pm AEST.