Speak to an AustralianBook a call ›
Book a call
  • Australian owned and operated
  • Project-specific compliance evidence coordinated
  • Typical factory production: 20–30 days
  • Typical delivery: 20–30 days
  • Typical 40–60 days total, factory to site
  • China factory pricing
  • Finance available through Ausloans
  • As seen in Domain
  • Written project scope before commitment
  • Models shown as starting points for project scoping
  • Australian owned and operated
  • Project-specific compliance evidence coordinated
  • Typical factory production: 20–30 days
  • Typical delivery: 20–30 days
  • Typical 40–60 days total, factory to site
  • China factory pricing
  • Finance available through Ausloans
  • As seen in Domain
  • Written project scope before commitment
  • Models shown as starting points for project scoping

Expandable homes

Expandable Homes

Folded down to container width for the road, then opened out on site to several times the footprint they travelled at.

Get a free quote

An expandable arrives closed. It travels inside a container footprint, gets set down on your footings, and then opens out into a home far wider than what came off the truck. The walls, the floor, the roof and the fit out are all folded inside that box already.

The closed size is the number that matters, because it is the number that decides whether the truck can reach your block. We publish it on every model page rather than only the opened size. Our range runs from a compact studio at about three metres closed, up through 20 ft and 30 ft transport footprints to a 40 ft family home.

Set down, opened and locked out, then connected once your plumber and electrician are on site. It goes up in hours rather than months. The kitchen and the bathroom are fitted at the factory, so there is no second trade standing around waiting on the first one to finish.

People choose these when the clock matters. Somewhere to live while the main house goes up. Accommodation on rural land that has no house on it yet. Cabins for a park. A first home on a block that is not ready for a permanent build. Because it travels closed, it also gets into sites a full width module cannot, which is often the deciding factor on a narrow driveway.

Built to order to NCC Class 1a requirements. Compliance documentation supplied.

Two models that used to sit in this range are listed elsewhere now, because they are not homes. The EX20X folding container and the EX20Z site accommodation container are open shells that fold flat for freight and stand up on a work site in an hour. No kitchen, no bathroom, no fit out. If the building is going onto a construction site, a mine camp or an emergency deployment rather than onto a block you live on, start there instead.

Expandable home questions we get asked most

What is an expandable home?

It is a home that travels closed and opens out on site. The rigid core carries the kitchen, the bathroom and the services. The side wings fold in for transport and fold out once it is set down, which is how you get a finished home to a block that a wide load could never reach.

How wide is it when it is closed for transport?

Closed, it travels within a standard shipping container footprint, which is the whole point of the design. The closed dimension is the number that decides whether it can get to your block, so we publish it on every model page rather than only the opened size. Check the closed width against your access before anything else.

Does an expandable home need council approval?

Once it is set down on footings and connected to services, it is a building and it is assessed as one. That means planning approval and building approval, and the pathway depends on your state and your council. We build to order to NCC Class 1a requirements and supply the compliance documentation. Your certifier makes the decision.

Can it be moved again later?

It can be closed back down and relocated, which is one of the reasons people choose one for a block they may not keep forever. It is not a caravan though. Moving it means disconnecting services, a crane at both ends and a transport permit, so treat it as a considered move rather than a weekend job.

What foundation does it need?

It sits on engineered footings sized from a soil test of your block, not on bare ground. Screw piles, concrete pads or a slab are all used depending on the soil classification, the slope and what your engineer specifies. Getting the soil test done early is the single best thing you can do to keep the job on track.

Get a Quote

Get a Quote

Tell us the model and your postcode. We come back with a landed price for your block.

Start my quote

Every model in this range

6 models, all built to order and delivered Australia wide. Factory quote available.

See the full range

Future Modular Homes

Get a Quote

Australian owned and operated, with China factory pricing. Project-specific compliance evidence is coordinated for your certifier.

Typical factory production is 20–30 days and typical delivery is 20–30 days, around 40–60 days in total from order to site. Australia-wide logistics are coordinated by project; international enquiries are assessed individually.